Photos from the third phase of construction following completion of framing. This stage includes electrical, plumbing and heat/ventilation rough-in. We're doing our own installation of low-voltage wiring, including the telephone, cable TV, computer network, ceiling speakers and security sensors.

Most recent photos are at the top of the page.

Week 24 (Aug 14-20)

Interior walls are looking smooth. Next step will be texture. We'll be getting a texture called "old world". The crew started applying stucco on Tuesday.

Interiors walls after tape and mud

Stucco application is underway

Nice view of scratch coat

Letting the first coat dry

Applying second stucco coat

John Joy designs custom art glass windows

John showing some example photos

Sketching a design for bathroom window

Design sketches

Glass samples

Drywall texturing applied in the kitchen and hallway

Close-up of second stucco coat

View of house with second stucco coat

 

Week 23 (Aug 7-13)

Work has started on tape and mud for the sheet rock. Exterior doors have arrived. Sue and I painted some textured sheetrock to see how our paint will look.

Kitchen sheet rock smoothed with tape and mud

Some doors have arrived

Plaster mix for exterior stucco

Door on side of garage installed. It's supposed to be hinged on the other side.

Temporary front door installed

Doors on back side of house. The near one is the side garage entry. The other is for access to the water heater.

Baron is helping with the sheet rock work.

Manuel, Baron's person, works on smoothing the sheet rock

Paint colour for the guest bedroom

Paint colour for the front entry and kitchen

Here's our main colour palette. The middle colour is for the living/dining room

Paint chip from Martha Stewart that closely matches our palette

 

Week 22 (July 31-Aug 6)

Sheetrock was installed this week. The pocket doorframe installed for the front office. On the weekend we started checking out paint colors and worked on the dimensions for the fireplace mantel.

Sheetrock is going in

Sheetrock going into the kitchen

Installing sheetrock in garage

Looking much brighter with all this whiteness

Installing the bathtub

Covering the pocket door frame by the front hallway

Kitchen colors

Living room colors

The sunny yellow color on the right is for the office. The color on the left is for the living room

Cutting in a recessed box for security panel

Working on the dimensions of our fireplace mantel

Medallion that we're looking at for our porch

Close-up of the medallion

 

Week 21 (July 24-30)

The paper and wire for stucco was finished and insulation installed. The crew had to do some work under the living room to shore up the floor because our hardwood floor company thought it had too much "bounce". We decided to install the prep for air conditioning so that it would be easy to add later.

Prepping for stucco

Some of the wire runs that Sue and I installed

Jose and Davios

Attaching wire for stucco support

Installing half-timbers

Sheetrock material has arrived. It goes in next week.

Insulation ready to be installed

Walls and ceilings packed with insulation.

Looks very cosy!

Latest exterior view of house

 

Week 20 (July 17-23)

The roof was installed and Sue and I did more work on the wiring. We had a terrible heat wave this week but it did not seem to slow down the roofers.

Loading up roof material

Loading roof materials onto conveyor

Working up on the roof

That's a steep roof. Hold on to the rope!

View of the progress

Scaffold around turret

Inspector Bob signs off

Jose is hard at work

Paper and wire for stucco is going up

Roof's done!

 

Week 19 (July 10-16)

Fireplace has arrived

Installing fireplace

Securing fireplace ductwork

Installing flashing around turret

Venting for fireplace in roof

Fireplace duct

More fireplace duct in attic

Plumbing vents in attic

Electrician Dave installing ground wire

Electrician Gary wires our panel

Plumbing

Plumber installing pipes

More pipes up in our attic

Some of the wiring Sue and I installed

We started running wires under the attic floor

 

Week 18 (July 3-9)

Plumbers roughing in drains

Going over electric plan with Electrician Gary

Arch added over garage door

Installing box for network and phone connections

Adding conduit. This is so we can add or change wiring later without ripping up walls

Light cans installed in living room

Light cans in kitchen

Heating/venting crew crawling under house. The hole is where the furnace will be installed

Borrowed Gary's "Hole Hog" drill. This bores through the double stud plate in seconds.

The orange wall box at bottom is for an iPod dock and volume control for audio in bathroom.

Cutting holes for low-voltage wire runs back to wiring closet.

Sheet metal appears on our roof.

Installing rain gutters

Dale measures for hardwood floors

Gary wiring up lights

 

Week 17 (June 26-July 2)

This week the framing was inspected and a few corrections made. Then windows were installed. Electricians Gary and Dave arrived to begin roughing in wall boxes and wiring. We started installing some low-voltage wall boxes, but need to wait until more electric wiring is in place so we know how to route around it.

Structural engineer Ryan inspects Raul's framing work

The windows and skylights have arrived!

Windows and skylights stacked up in our garage

Architect Steve consults with Raul about the kitchen window

Electrician Dave putting in the wiring

Electrician Gary drilling holes with his "Hole Hog"

Raul and crew installing windows

Steve and Raul inspect the framing above kitchen window

Master bedroom window. New electric panel is on left

Getting ready to install low-voltage wall boxes