|
The front as delivered.
|
|
|
Friends help with the site-installed bits.
|
|
|
Kathy on the job.
|
|
|
The front with our pieces installed and the foundation
walls in progress.
|
|
|
The front door.
|
|
|
The front door glass.
|
|
|
Rose buds.
|
|
|
Hummingbird.
|
|
|
Foundation walls reaching up to the bay windows.
|
|
|
Coming along.
|
|
|
The lower retaining wall for the back yard.
|
|
|
The garage foundation.
|
|
|
The garage floor in place.
|
|
|
Kathy on the job.
|
|
|
We get front steps.
|
|
|
The radiant floor heating system.
|
|
|
The retaining walls around the back yard.
|
|
|
View of the back of the house.
|
|