Click through build
Septic is inspected and installed. Excavation is completed with footings undergoing geo-technic inspection.
Cemenet pour is seismic overkill; safety factor of about 3x what's really needed. Massive footings.
Current 11 2004
|
 Click through build timeline
Water tight metal roof with first half of solar cells & cogneerative thermal power
A nice big space inside, with lots of light from 3 skylights on the right (south) roof.
|