|
First Floor Construction
Jan 10th 2004 -
Here is Sean in the 'accessory structure'. Look at all this wood!
Openings are garage door size.
The big beams 'under' the floor will be seen on the cieling. The top of the steel column is where the second floor will be.
See how the beam is anchored to the wall?
Dad has some big lego's!
More to come....
Floor is completed: 01/22/04
(Web cam photo)
|