John & Lisa's Coastal House Build
|
home
Current 11 2004
| Current 11 2004 |
Electrical
|
Build : Excavation / Footing
|
Foundation
|
Accessory Structure Construction 'partial below grade accessory structure'
|
Build ARXX (foundation and up)
|
First Floor Construction
|
First Floor
|
Status Sept 2004
|
House Details (3D Model & Picts)
|
Site & Views
|
Parking Area & Yard - tractor fill
|
Contact Us
Click through build
Septic is inspected and installed. Excavation is completed with footings undergoing geo-technic inspection.
Cemenet pour is seismic overkill; safety factor of about 3x what's really needed. Massive footings.
Current 11 2004
Current 11 2004
Electrical
Build : Excavation / Footing
Foundation
Accessory Structure Construction 'partial below grade accessory structure'
Build ARXX (foundation and up)
First Floor Construction
First Floor
Status Sept 2004
House Details (3D Model & Picts)
Site & Views
Parking Area & Yard - tractor fill
Contact Us
Click through build timeline
More pictures on : Water Tank, Fire Hydrant, Service Trench (Electric & Water)
Michael Hamilton plants the tank