This chapter provides an overview of the hardware installation and software configuration process of the protocol translator. The protocol translator is a special configuration C chassis unit (2-slot system bus) that supports one Ethernet and one synchronous serial port with X.25 as an option. The protocol translator is a fixed configuration unit; that is, you cannot add or subtract components in the same way you can with the router products. The software will not operate if you try to use an alternate configuration in the protocol translator.This chapter puts into perspective the tasks you must perform to get your protocol translator up and functioning with the features you need.

The primary focus of this guide is to describe the setup command facility and its position within the entire installation and configuration process. The setup command facility enables you to start using your protocol translator quickly and without extensive background knowledge by prompting you for the information required to perform basic configuration procedures.

The setup command facility can be used both at initial system configuration and for changes to the basic configuration at any time. The facility is also a teachng tool that helps you become familiar with the expected command sequence as you step through the configuration process. Because of these unique characteristics, Cisco refers to setup as a command facility rather than simply a command.

The setup command facility is available on all Cisco Systems internetworking products with Software Release 8.2 or later.

Installation and Configuration Process

Six phases make up the installation and configuration process. Each phase includes tasks that will help you to use your protocol translator to meet your networking needs. Figure 1-1 shows the relationship between the phases and the tasks within each phase.

Detailed information for each phase within the installation and configuration process is available either in this guide or other appropriately referenced publications. A brief description of phase 1, Preinstallation, and phase 2, Installing Your Protocol Translator, immediately follows this figure. These phases are hardware related and are not described in a later section of this guide as are phases 3 through 6. Phases 1 and 2 have been included here for completeness.




Figure 1-1: Installation and Configuration Process

Preinstallation

Preinstallation refers to tasks you must perform before starting actual system hardware installation. Note that this phase must precede all other phases of the installation and configuration process. The preinstallation tasks are as follows:

Some of the items you should consider are site environment, cabling requirements of planned connections, modular wiring system requirements, and tools and equipment requirements.
Verify that you have received all that you have ordered and that shipping damage has not occurred.

Refer to the appropriate hardware installation and maintenance publication for the protocol translator you have ordered for more detailed information about preinstallation tasks.

Installing Your Protocol Translator

After you have performed the preinstallation tasks, you must install the protocol translator. The installation process no longer requires you to install appliques, connectors, interface cards, or system cards. The protocol translator will be preconfigured to your specifications when you order it.

Refer to the appropriate hardware installation and maintenance publication for the protocol translator you have ordered for more detailed information about installation tasks.

When you complete these two phases you can begin phase 3, Preparing for First-Time Startup, described in Chapter 2 of this guide.