Quick Installation Worksheet

Quick Installation Worksheet

Quick Installation Worksheet

This appendix describes installation procedures you should use for installing LightStream 1010 ATM switches after your first installation.

The installation and configuration of the LightStream 1010 ATM switch can be separated into specific steps. If each step described in the Quick Installation Worksheet (see Table C-1) is completed following the instructions provided in this publication, LightStream 1010 ATM switch installation should be successful. If the installation fails to make the LightStream 1010 ATM switch function properly in the first attempt, the Quick Installation Worksheet can be used to systematically check that each step was performed correctly.

Copy the Quick Installation Worksheet and initial each procedure as it is completed. Each task in the Quick Installation Worksheet should be verified by the person performing the installation and dated for the permanent site record.

Every task in the Quick Installation Worksheet is described in detail in this publication or in the LightStream 1010 ATM Software Configuration Guide, and is listed in the index.

Table C-1 : Quick Installation Worksheet

Task Completed
Complete Switch Installation Checklist
Complete Switch Component Checklist
Complete Port Configuration Worksheets
Rack-mount the switch
Connect cables
Connect power cables
Switch power on
Configure line [aux|console]
Configure SNMP
Set clock (optional)
Test the configuration